Mid-Missouri road work for June 1-5

The following is the Missouri Department of Transportation’s listing of planned general highway maintenance and construction work in the Mid-Missouri area for June 1-5.

Cole County

• U.S. 54 between Stadium Boulevard and Route AA in Miller County — Pavement and safety improvements, including guardrail and guard cable installation, continue through November.

• U.S. 54 between Route CC and Shepherd Hills Road —Drainage repair in the eastbound lanes Monday and Tuesday.

• Route E between U.S. 50 and Route B — Shoulder construction continues through late August.

• Route M between U.S. 50 and Route W — Shoulder construction continues through late August.

Boone County

• Route HH over Hinkson Creek, East of Deer Valley Lane — Bridge deck rehabilitation. The bridge is closed through early August.

• Providence Road between Stadium Boulevard and Business Loop 70 in Columbia — ADA improvements and sidewalk upgrades.

Callaway County

• I-70 North Outer Road between routes A and D — Pavement improvements are scheduled to begin Monday.

Cooper County

• Missouri 179 over the Petite Saline Creek — Bridge replacement. The bridge is closed through August.

Maries County

• U.S. 63 between Missouri 28 and U.S. 50 in Osage County — Pavement sealing and marking are scheduled to begin Monday.

• Route P between U.S. 63 and Missouri 68 — Pavement patching.

• Route T between Missouri 42 and U.S. 63 in Osage County — Roadway resurfacing continues through June.

Miller County

• U.S. 54 at Route W — Interchange construction continues until December 2021. Temporary bypasses are in place in the eastbound and westbound lanes.

• U.S. 54 between Route AA and Stadium Boulevard in Cole County — Pavement and safety improvements, including guardrail and guard cable installation, continue through November.

• Route C over Deane Creek, south of Rollins Creek Road — Bridge deck replacement is scheduled to begin Monday. The road will be closed through late August.

• Route U between Missouri 42 and 17 in Pulaski County — Resurfacing, culvert pipe installation and shoulder widening continue through November.

• Route W between Route Y and Missouri 5 in Morgan County — Resurfacing and shoulder widening continue through November.

Moniteau County

• Route CC over Burris Fork, south of Walking Acres Road — Bridge replacement. The road is closed through mid-July.

Morgan County

• Route D between Missouri 52 and Gunn Road — Culvert pipe replacement is scheduled Monday.

• Route W between Missouri 5 and Route Y in Miller County — Resurfacing and shoulder widening continue through November.

Osage County

• Missouri 100 over Shawnee Creek, west of Route Z — Bridge replacement is scheduled to begin Monday. The bridge will be closed through October.

• U.S. 63 between U.S. 50 and Missouri 28 in Maries County — Pavement sealing and marking are scheduled to begin Monday.

• Route P between U.S. 63 and Missouri 133 — Roadway resurfacing continues through June.

• Route T between U.S. 63 and Missouri 42 in Maries County — Roadway resurfacing continues through June.