Capitol circle drive getting $500,000 in upgrades

Julie Smith/News Tribune photo: 
While Chris Tharp operates the milling machine as co-worker and sister Lacy Badger follows on the ground Tuesday, July 11, 2023, as they chip up the existing asphalt and send it up the conveyor belt to the dump truck in front of the machine.  The south drive in front of the Missouri Capitol is temporarily closed as a crew from Capital Paving prepares the drive for resurfacing. Work is expected to be completed by July 28.
Julie Smith/News Tribune photo: While Chris Tharp operates the milling machine as co-worker and sister Lacy Badger follows on the ground Tuesday, July 11, 2023, as they chip up the existing asphalt and send it up the conveyor belt to the dump truck in front of the machine. The south drive in front of the Missouri Capitol is temporarily closed as a crew from Capital Paving prepares the drive for resurfacing. Work is expected to be completed by July 28.


The primary road in front of the Missouri Capitol Building is closed until nearly the end of July.

The south circle drive of West Capitol Avenue closed Sunday evening for roadway repairs, repaving and restriping.

Upcoming Events